首页> 外文会议>7th Annual IEEE International Systems Conference >Early estimation of project performance: The application of a system dynamics rework model
【24h】

Early estimation of project performance: The application of a system dynamics rework model

机译:项目绩效的早期评估:系统动力学返工模型的应用

获取原文
获取原文并翻译 | 示例

摘要

We address the problem of rework in complex project management by the use of System Dynamics modeling and estimated planned performance profiles. We propose that early indications of problems arising with a project can be generated by comparing estimated planed performance profiles with actual performance profiles. Estimating project quality for use in the System Dynamics models thus becomes the key challenge to enable the use of this leading indicator. Estimates of project quality based on experience of project type, size and complexity within the organization can be used to parameterize the System Dynamics models to generate model generated estimated planned performance profiles. Early results indicate that the morphology of these profiles shows good agreement with project data emerging from the metrics initiative within Thales UK.
机译:我们通过使用系统动力学建模和估计的计划绩效概况来解决复杂项目管理中的返工问题。我们建议可以通过将估计的计划绩效概况与实际绩效概况进行比较来生成项目产生的问题的早期迹象。因此,估计要在System Dynamics模型中使用的项目质量成为了使用该领先指标的关键挑战。基于组织内部项目类型,规模和复杂性的经验进行的项目质量评估可用于参数化System Dynamics模型,以生成模型生成的估算计划绩效概况。早期结果表明,这些剖面的形态与Thales UK的度量标准计划中涌现的项目数据显示出良好的一致性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号