首页> 外文期刊>Information and software technology >Dynamic Project Performance Estimation By Combining Static Estimation Models With System Dynamics
【24h】

Dynamic Project Performance Estimation By Combining Static Estimation Models With System Dynamics

机译:通过将静态评估模型与系统动力学相结合来进行动态项目绩效评估

获取原文
获取原文并翻译 | 示例
           

摘要

Changes in user requirements or project personnel occur frequently during project execution particularly in long-term and large-size projects. We need a tool which can estimate the effects of changing conditions to effectively manage the project.rnThis paper proposes a simulation method for dynamic project performance in terms of effort, schedule, and defect density changes in a dynamic project environment by combining COCOMO II with system dynamics. We apply expert judgment technique to overcome the lack of empirical data on the effects of dynamic project environment. We develop a simulation tool (available on the authors' website) which has model adjustment parameters to reflect experts' estimation on project characteristics. The simulation experiment on a military application development project demonstrates that the developed model can show the behavioral characteristics of a project suffering unanticipated and uncontrolled requirements creep. This helps project managers understand interactions between project factors and proactively evaluate and control the effects of dynamic project environment.
机译:用户需求或项目人员的更改经常在项目执行期间发生,特别是在长期和大型项目中。我们需要一个可以估算条件变化的影响的工具,以有效地管理项目。rn本文提出了一种通过将COCOMO II与系统相结合,在动态项目环境中根据工作量,进度和缺陷密度变化对动态项目绩效进行仿真的方法。动力学。我们运用专家判断技术来克服缺乏对动态项目环境影响的经验数据。我们开发了一个仿真工具(在作者的网站上可用),该工具具有模型调整参数,以反映专家对项目特征的估计。在军事应用开发项目上进行的仿真实验表明,开发的模型可以显示遭受意外和不受控制的需求蠕变的项目的行为特征。这有助于项目经理了解项目因素之间的相互作用,并主动评估和控制动态项目环境的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号