【24h】

Pavement Design for the 3rd Runway at Stockholm-Arlanda Airport, Sweden

机译:瑞典斯德哥尔摩-阿兰达机场第三跑道的路面设计

获取原文
获取原文并翻译 | 示例

摘要

The 3rd Runway at Stockholm-Arlanda Airport, the main international airport of the capital of Sweden is currently under construction and will be opened for air traffic in 2002. A pavement design for the new runway has been carried out in a project run by the Swedish CAA. The design has been carried out for both flexible and rigid pavement alternatives. During the design work present research results and experiences have been taken into consideration. Different design methods and recently developed software have also been used. Sensibility analyses have been made and the flexible and rigid alternatives have been compared and evaluated by life-cycle cost analyses. The alternative that finally was chosen was a flexible pavement for the runway system and a rigid pavement for the de-icing aprons. At the moment the paving work that has proceeded during the last three seasons is finished and the new runway will be opened in a few months.
机译:瑞典首都主要国际机场斯德哥尔摩-阿兰达机场的第三条跑道目前正在建设中,并将于2002年开放用于空中交通。瑞典人在一个项目中进行了新跑道的路面设计CAA。已经针对柔性和刚性路面替代方案进行了设计。在设计工作中,目前的研究结果和经验已得到考虑。还使用了不同的设计方法和最近开发的软件。进行了敏感性分析,并通过生命周期成本分析对柔性和刚性替代方案进行了比较和评估。最终选择的替代方案是跑道系统的柔性路面和除冰围裙的刚性路面。目前,过去三个季节中进行的摊铺工作已经完成,新的跑道将在几个月后开放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号