Use of Backcalculated Falling Weight Deflectometer Modulus for Detecting Foundation Problems Caused by Rubblization of Concrete Pavements

机译:使用反算的落锤挠度计模量检测混凝土路面的碎石化引起的地基问题

获取原文
获取原文并翻译 | 示例

摘要

In 1998, two rubblized-pavement sections of Interstate 10 in Florida failed prematurely and showed severe rutting. During and after rubblization large amount of water was observed flowing from edge drains next to the failed areas. Falling weight deflectometer measurements were taken immediately after rubblization, as well as one month and three months later. The backcalculated base and subgrade moduli showed softened sections immediately after rubblization, with a recovery period in excess of one month. A detailed study of the conditions leading to failure showed that the failure of the sections was likely due to the development of positive pore pressures in the base and subgrade during rubblization. These positive pore pressures lead to poor compaction after rubblization and severe rutting with localized potholes immediately after the first holiday traffic. Further analysis of the back-calculated moduli also showed that the problem was compounded by the absence of a tack-coat between the asphalt concrete and the rubblized layer, leading to poor load transfer to the lower layers.
机译:1998年,佛罗里达州10号州际公路的两个碎石路面过早失效,并显示出严重车辙。在碎石化过程中和碎石化之后,观察到大量水从靠近故障区域的边缘排水口流出。落差偏转计的测量是在摩擦后以及一个月和三个月后立即进行的。反算的基础和路基模量在碎石化后立即显示出软化的截面,恢复期超过一个月。对导致破坏的条件的详细研究表明,这些断面的破坏很可能是由于在磨碎过程中基部和路基中产生了正的孔隙压力。这些正的孔隙压力会导致碎石后的致密性变差,并在首次度假后立即出现局部车辙的严重车辙。对反算模量的进一步分析还表明,由于在沥青混凝土和碎石层之间不存在粘性涂层,问题变得更加复杂,导致荷载传递到下层的能力很差。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号