首页> 外文会议>The 5th International Conference on Reliability, Maintainability and Safety Vol.2 Aug 28-31, 2001 Dalian, China >THE DEVELOPEMET OF DYNAMIC PROGRAMMING APPROACH TO ALLOCATE SCARE FUNDS IN THE BRIDGE MAINTENANCE, REHABILITATION, AND REPLACEMENT PLANNING
【24h】

THE DEVELOPEMET OF DYNAMIC PROGRAMMING APPROACH TO ALLOCATE SCARE FUNDS IN THE BRIDGE MAINTENANCE, REHABILITATION, AND REPLACEMENT PLANNING

机译:动态规划方法的开发,用于在桥梁维护,修复和更换计划中分配稀缺资金

获取原文
获取原文并翻译 | 示例

摘要

Today's, the transportation facilities such as terminals, street, bridge, etc..., represent the major investment in highway network. Every year tremendous resources should be invested to maintain these facilities. Among them, the Bridge Management System (BMS), has been necessitated by large imbalance between extensive bridge repair and maintenance needs and limited available budget. So the main purpose of this research study is to develop an optimization methodology to allocate the limited resource among the most bridge maintenance demanded projects, The reduction of user cost or increased the user benefit can be considered as the main objective function of the developed Dynamic Programming optimization model. The results of the implemented of optimization model shows a tremendous cost saving can be obtained and more demanded bridge requiring the maintenance can be selected.
机译:如今,诸如码头,街道,桥梁等的运输设施代表着对高速公路网络的重大投资。每年应投入大量资源维护这些设施。其中,由于广泛的桥梁维修需求和有限的可用预算之间的巨大不平衡,因此需要桥梁管理系统(BMS)。因此,本研究的主要目的是开发一种优化方法,以在桥梁维护需求最大的项目之间分配有限的资源,减少用户成本或增加用户收益可以视为开发的动态规划的主要目标功能。优化模型。优化模型的实施结果表明,可以节省大量成本,并且可以选择要求更高的桥梁进行维护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号