首页> 外文会议>5th International Conference on Probabilistic Safety Assessment and Management Vol.4, Nov 27-Dec 1, 2000, Osaka, Japan >Estimate of the impact of changes to a preventive maintenance plan on the operating safety of electrical systems
【24h】

Estimate of the impact of changes to a preventive maintenance plan on the operating safety of electrical systems

机译:估计预防性维护计划变更对电气系统的运行安全的影响

获取原文
获取原文并翻译 | 示例

摘要

This article deals with a new method enabling to measure the value of changing the maintenance policy, and carry out a technical-economic calculation to achieve the best maintenance / reliability cost ratio. In this way, it is possible to determine the plan that will achieve the best compromise between cost and achievement of reliability objectives, and if necessary to vary the intervals and contents of maintenance tasks in order to meet predefined economic objectives. Then, thanks to this approach it is not necessary to wait for a new operating experience feedback cycle in order to chek wether or not the choice of a new maintenance plan was good or not.
机译:本文讨论了一种新方法,该方法能够测量更改维护策略的价值,并进行技术经济计算以达到最佳维护/可靠性成本比。这样,可以确定将在成本和可靠性目标的实现之间取得最佳折衷的计划,并在必要时更改维护任务的间隔和内容以满足预定的经济目标。然后,由于采用了这种方法,因此不必等待新的操作经验反馈周期就可以检查是否选择新的维护计划是好还是不好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号