首页> 外文会议>5th International Conference on Probabilistic Safety Assessment and Management Vol.4, Nov 27-Dec 1, 2000, Osaka, Japan >Last methodological developments introduced for the building of the N4 PSA (1400 MW EDF power plants)
【24h】

Last methodological developments introduced for the building of the N4 PSA (1400 MW EDF power plants)

机译:介绍了用于N4 PSA(1400 MW EDF电厂)建设的最新方法论发展

获取原文
获取原文并翻译 | 示例

摘要

These development are combined with the use of the basic systems of knowledge. All the fault trees on the PSA 1300 and N4 were built with KB3, as well for the hydraulic, electric and I&C systems. The use of KB3 improves the homogeneity, the compatibility and the traceability of the studies of the material missions carried out by different people in different centers. AQS formalization improves the exhaustiveness and the traceability of the functional analysis. The simplified modeling of I&C for the automatic actions makes to easily analyze the dependences possible on this system. And the human factor renewed analyze considering the global control system, allows more realism and a better exploitation of the lesson of these studies. With all these elements, EDF considers they have means of modelings powerful and perennial for the next updates of the PSA of reference and for the needs for the uses of the PSA.
机译:这些发展与基本知识系统的使用相结合。 PSA 1300和N4上的所有故障树都是使用KB3构建的,也适用于液压,电气和I&C系统。 KB3的使用提高了不同中心不同人员进行的物质任务研究的同质性,兼容性和可追溯性。 AQS形式化提高了功能分析的详尽性和可追溯性。自动动作的I&C简化模型使分析该系统可能的依赖关系变得容易。并考虑了全球控制系统,对人为因素进行了更新分析,从而使这些研究的教训更具现实性并得到了更好的利用。考虑到所有这些要素,EDF认为,对于PSA参考的下一次更新以及PSA使用的需求,它们具有强大而常年的建模方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号