The development of wind farms has taken unprecedented priority in recent times. Its fast integration to existing installations can result in overstress problems. This work analyses the overstress impact of the integration of new wind farms in the Brazilian Interconnected Power System. The analysis is focused on the largest producer substation of wind power in the country. Initially, the methodology of overstress analysis in high voltage installations is presented. Both short circuit and overload evaluations are considered. The results show that mitigating measures and operational strategies are fundamental actions to overcome the overstress problems without equipment replacing.
机译:近年来,风电场的开发受到了前所未有的重视。它与现有设备的快速集成会导致过应力问题。这项工作分析了巴西互联电网中新风电场整合带来的过应力影响。分析的重点是该国最大的风能生产变电站。最初,介绍了高压设备中的过应力分析方法。同时考虑了短路和过载评估。结果表明,缓解措施和运营策略是克服超负荷问题而无需更换设备的基本措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号