NEW TECHNOLOGIES ADOPTED IN THE CONSTRUCTION OF NEW NO.3 BLAST FURNACE AT WISCO

机译:武钢新建3号高炉采用的新技术

获取原文
获取原文并翻译 | 示例

摘要

In the early 80's after the commissioning of 1700mm rolling mill system, one project nominated 《Double Four Million Tons of Iron and Steel》 had been carried out. In 1985, the annual iron and steel production at WISCO reached 3.98 Mt and 4.06 Mt respectively, however, the steel productivity was still insufficient to cope with the existing rolling capacity. Therefore, an expansion project entitled 《Double Seven Million Tons of Iron and Steel》 aiming at matching the rolling capacity was proposed in 1986. Through modification carried out in 80's, the actual ironmaking capacity of existing four blast furnaces reached 4.7 to 4.8 million tons per annum. In order to meet the final target of 7.0 million tons of pig iron, the capacity of the new blast furnace should have an annual tonnage of 2.2 to 2.3 million tons of pig iron. Therefore, the expansion project {Double Seven Million Tons> is mainly composed of the construction of one new blast furnace Cknown as New No. 3 BF) with 2.2 to 2.3 million tons of pig iron capacity per annum as the first step and the construction of a new BOF shop NO. 3 Steelmaking Plant a few year later as the second step.
机译:1700mm轧机系统投产后的80年代初,一项名为《钢铁双400万吨》的工程已经进行。 1985年,武钢的钢铁年产量分别达到3.98吨和4.06吨,但是钢的生产率仍然不足以应付现有的轧制能力。因此,1986年提出了一项旨在与轧制能力相称的“双700万吨钢铁”扩建项目。通过80年代的改造,现有的四个高炉的实际炼铁能力达到4.7至480万吨/年。每年。为了达到最终目标700万吨生铁,新高炉的产能应达到2.2至230万吨生铁的年吨。因此,扩建工程(“双700万吨”)主要由建设一座年产2.2至230万吨生铁的新高炉(称为3号新高炉)和新的BOF商店编号几年后,第三炼钢厂作为第二步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号