Investigations on the 3GC DC Trip by the Saturation Protection of Zhengping Converter Transformer after the No Load Energization of Wunan 750MVA Transformer

机译:武南750MVA变压器空载通电后,郑平换流变压器的饱和保护3GC直流跳闸的研究。

获取原文
获取原文并翻译 | 示例

摘要

Both EMTDC program and real time HYBRID SIMULATOR are used to analysis the P1 trip of Three gorges to Changzhou (3GC) HVDC link by converter transformer saturation protection at Zhengping after energization of Wunan 750MVA AC transformer in Jan, 16, 2003. Factors affect the amplitude and duration of the neutral current of the converter transformer include the saturation characteristic of Wunan transformer, unsynchronization of the three phases of the AC circuit breaker and DC transmission power etc. are considered.
机译:2003年1月16日,武南750MVA交流变压器通电后,通过正平变流器变压器的饱和保护,使用EMTDC程序和实时混合仿真器对三峡至常州(3GC)HVDC线路的P1跳闸进行了分析。换流变压器的中性电流持续时间包括无南变压器的饱和特性,考虑交流断路器的三相不同步和直流输电功率等。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号