Bioengineering Restoration Strategies for Flashy Semi-Urban Streams: Herrick Hollow Creek, New York

机译:浮华的半城市河流生物工程修复策略:纽约Herrick Hollow Creek

获取原文
获取原文并翻译 | 示例

摘要

Amphenol Corporation was required to develop design measures to restore nearly a mile of Herrick Hollow Creek at the Richardson Hill Road Landfill Superfund Site, located in Masonville, NY. Herrick Hollow Creek eventually discharges via Trout Creek to the West Branch of the Delaware River and the Cannonsville Reservoir operated by the New York City Department of Environmental Protection (NYCDEP). New York City water supply undergoes only limited treatment. NYDEP's intense watershed protection requirements are aimed at urging developers and stream restorers to protect the natural purity of their water supply. Previous stream restoration measures designed by others had failed multiple times and much of the fill material placed in the stream corridor had been washed downstream into the drinking water reservoir. The situation was very tense due to the need for the NYCDEP to comply with EPA regulations limiting turbidity in the reservoir, and the NY Attorney General's office was involved. As a result, the Bioengineering Group was contacted to help provide immediate input regarding erosion control and eventually a full restoration design and construction strategy. As an immediate short-term remedy, several field-engineered interim measures were designed and installed to temporarily stabilize the channel. Next, a meeting of stakeholders was convened to establish clear and measurable goals and objectives for the restoration effort. A key to achieving consensus was for all to understand the trade-offs involved and to establish specific and quantifiable ecological restoration priorities. Emphasis on a holistic stream restoration continued by basing the design on site-specific hydrologic data combined of data referencing geomorphically and ecologically appropriate nearby stream reaches. After ecological performance was linked to fundamental geomorphology, full geotechnical and hydraulic engineering analysis was conducted to validate and refine the treatment designs. In early 2007, Bioengineering Group provided a Basis of Design report, with full consideration of the needs of the stakeholders. Stakeholder meetings were convened to establish clear and measurable goals and objectives for the restoration effort, and to gamer local and agency support for the project. We believe that a key to achieving successful consensus on this project was due to the effort to facilitate an understanding of the trade-offs involved in stream restoration projects. The combination of establishing a level of stakeholder communication and understanding, and applying engineering rigor to the project, served to maintain constructive interaction leading to successful project completion.
机译:要求安费诺公司制定设计措施,以恢复位于纽约州梅森维尔的理查森山路垃圾填埋场超级基金站点的赫里克·霍洛溪近一英里。赫里克·霍洛溪(Herrick Hollow Creek)最终通过鳟鱼溪排放到特拉华河的西支河和由纽约市环境保护局(NYCDEP)运营的坎农斯维尔水库。纽约市的供水仅受到有限的处理。 NYDEP对流域的严格保护要求旨在敦促开发商和溪流恢复者保护其供水的自然纯净。其他人设计的先前的河流修复措施多次失败,并且放置在河流走廊中的许多填充材料已在下游冲入饮用水水库。由于需要NYCDEP遵守EPA限制水库浊度的规定,因此局势非常紧张,纽约总检察长办公室也参与其中。结果,联系了生物工程小组,以帮助提供有关侵蚀控制的即时信息,并最终提供完整的修复设计和施工策略。作为一种短期补救措施,设计并安装了一些现场设计的临时措施来临时稳定通道。接下来,召开了利益相关者会议,为恢复工作确立了清晰可衡量的目标。达成共识的关键是让所有人都了解所涉及的取舍,并确定具体且可量化的生态恢复重点。通过基于特定地点的水文数据进行设计,继续强调整体溪流的恢复,这些数据结合了地貌和生态上合适的附近溪流的数据。在将生态性能与基本地貌联系起来之后,进行了完整的岩土工程和水力工程分析,以验证和完善处理设计。在2007年初,生物工程小组提供了一份设计基准报告,其中充分考虑了利益相关者的需求。召开了利益相关者会议,为恢复工作确定了明确且可衡量的目标,并为该项目提供了游戏玩家的本地和机构支持。我们认为,就该项目达成成功共识的关键在于努力促进对河流修复项目所涉及的权衡的了解。建立利益相关者之间的沟通和理解水平,以及对项目应用严格的工程技术,可以保持建设性的互动,从而成功完成项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号