首页> 外文会议>38th Annual International Solid Waste Exposition, Oct 23-26, 2000, Cincinnati, Ohio >LANDFILL CLOSURE DESIGN-BUILD: A TREND OF THE FUTURE -BEE RIDGE LANDFILL EXPERIENCE, SARASOTA COUNTY, FLORIDA
【24h】

LANDFILL CLOSURE DESIGN-BUILD: A TREND OF THE FUTURE -BEE RIDGE LANDFILL EXPERIENCE, SARASOTA COUNTY, FLORIDA

机译:填埋场封闭式设计的建立:未来的趋势-里奇·里奇(Ledge)填埋场经验,佛罗里达州萨拉索塔县

获取原文
获取原文并翻译 | 示例

摘要

This paper presents Camp Dresser & McKee Inc.'s (CDM's) innovative approach to the design, permitting, and construction of the Bee Ridge landfill closure in Sarasota County, Florida. The project included design and construction of the final cap for the Phase IV area and expansion of the existing landfill gas control system to achieve final closure of the site. As an alternative to traditional design-bid-build, the design-build approach to the Sarasota County project offered a schedule savings of more than 12 months and a cost savings of approximately one million dollars. Furthermore, the project demonstrated one of the exciting benefits of having design and construction personnel working together towards a common goal: innovative problem solving and value engineering. The paper also describes the design-build procurement process used for this project―from proposal preparation, permitting and construction activities―through completion and start-up.
机译:本文介绍了Camp Dresser&McKee Inc.(CDM)在佛罗里达州萨拉索塔县Bee Ridge填埋场封闭设计,许可和建造的创新方法。该项目包括设计和建造第四阶段区域的最终封盖,并扩展现有的垃圾填埋气控制系统以最终关闭该场地。作为传统的设计投标构建的替代方法,萨拉索塔县项目的设计构建方法节省了超过12个月的时间,节省了约一百万美元的成本。此外,该项目展示了让设计和施工人员共同努力实现一个共同目标的令人兴奋的好处之一:创新的问题解决和价值工程。本文还描述了用于该项目的设计,建造,采购过程,从提案准备,许可和建筑活动直至完成和启动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号