【24h】

Riverdale Road over I-84; Piecing it Together

机译:经由I-84的Riverdale Road;拼凑在一起

获取原文
获取原文并翻译 | 示例

摘要

The Riverdale Road over 1-84 Bridge in Riverdale, UT required replacement in conjunction with roadway widening and upgrading the interchange from a diamond to a Single Point Urban Interchange (SPUI). In order to reduce the construction impact to the area, the Utah Department of Transportation (UDOT) employed Accelerated Bridge Construction (ABC) using prefabricated bridge elements. Several innovative solutions were implemented including precast bent columns and caps, precast abutment wall sections, precast bolt-on end diaphragm sections, and precast non-composite concrete deck panels.
机译:犹他州里弗代尔1-84大桥上的里弗代尔路需要更换,同时还要加宽道路,并将立交桥从菱形升级为单点城市立交(SPUI)。为了减少施工对该地区的影响,犹他州交通运输部(UDOT)采用了预制桥梁构件的加速桥梁建设(ABC)。实施了几种创新的解决方案,包括预制弯曲的柱和盖,预制的基台墙部分,预制的螺栓式端部隔板部分以及预制的非复合混凝土面板。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号