The Nome Satellite project in the Norwegian Sea involved installation of a 9 km long 15" thermally insulated clad steel production pipeline. The pipeline is equipped with Direct Electrical Heating for hydrate control and an in-line T for connection of a mid-line reservoir. The installation was performed in 2005 with the reel ship "CSO Apache" after completion of comprehensive qualification programs. The Nome Satellite project represents a step forward in sub-sea pipeline technology, with the following main firsts: 1. Reeling of clad steel pipeline 2. Direct Electrical Heating of clad steel pipeline 3. Direct Electrical Heating of pipeline with in-line T 4. AUT of clad steel girth welds This paper presents experiences from the qualification and installation works.