首页> 外文会议>25th International Conference on Offshore Mechanics and Arctic Engineering 2006(OMAE2006) vol.4 >REEL INSTALLATION OF 15' CLAD STEEL PIPELINE WITH DIRECT ELECTRICAL HEATING AND IN-LINE T
【24h】

REEL INSTALLATION OF 15' CLAD STEEL PIPELINE WITH DIRECT ELECTRICAL HEATING AND IN-LINE T

机译:直接电加热和在线T型15''包钢管道的卷盘安装

获取原文
获取原文并翻译 | 示例

摘要

The Nome Satellite project in the Norwegian Sea involved installation of a 9 km long 15" thermally insulated clad steel production pipeline. The pipeline is equipped with Direct Electrical Heating for hydrate control and an in-line T for connection of a mid-line reservoir.rnThe installation was performed in 2005 with the reel ship "CSO Apache" after completion of comprehensive qualification programs.rnThe Nome Satellite project represents a step forward in sub-sea pipeline technology, with the following main firsts:rn1. Reeling of clad steel pipelinern2. Direct Electrical Heating of clad steel pipelinern3. Direct Electrical Heating of pipeline with in-line Trn4. AUT of clad steel girth weldsrnThis paper presents experiences from the qualification and installation works.
机译:挪威海的Nome卫星项目涉及安装9公里长的15英寸隔热复合钢生产管道。该管道配备有用于水合物控制的直接电加热系统和用于连接中层水库的管线T。 rn Nome Satellite项目代表了海底管道技术的进步,主要有以下第一项:rn1。包钢管道的卷取rn2。包覆钢管道的直接电加热rn3。带管线Trn4的管道直接电加热。包覆钢环焊缝的AUT本文介绍了鉴定和安装工作的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号