首页> 外文会议>25th Annual International Bridge Conference: IBC 2008: Home of the Bridge industry >Rapid Set Latex Modified Concrete Bridge Deck Overlays on the SR 376 Parkway in Pittsburgh, PA
【24h】

Rapid Set Latex Modified Concrete Bridge Deck Overlays on the SR 376 Parkway in Pittsburgh, PA

机译:宾夕法尼亚州匹兹堡SR 376公园大道上的快速固化乳胶改性混凝土桥面覆盖层

获取原文
获取原文并翻译 | 示例

摘要

Bridge Deck Deterioration is a major problem throughout the United States. Many Highway Departments are making the decision to preserve existing bridge deck facilities rather than replace them because long term structural repairs can now be performed cost effectively and during low traffic periods (nights & weekends). By placing Rapid Set Latex Modified Concrete Overlays on Total Surface Hydrodemolition Prepared Surfaces, an owner can repair and preserve bridge decks for 25 years with minimum traffic impacts. The Pennsylvania Department of Transportation performed a project in 2007 where 21 bridge decks on the SR 376 Parkway in Pittsburgh, PA were structurally repaired in just 14 weekends.
机译:桥面甲板恶化是整个美国的主要问题。许多公路部门正在决定保留现有的桥面甲板设施,而不是更换它们,因为长期的结构维修现在可以经济高效地进行,并且可以在人流少的时期(晚上和周末)进行。通过将快速固化的乳胶改性混凝土覆盖层放置在总表面加氢爆破准备好的表面上,车主可以将桥面板维修和保养25年,而对交通的影响最小。宾夕法尼亚州交通局在2007年执行了一个项目,仅在14个周末就对宾夕法尼亚州匹兹堡SR 376大路的21个桥面进行了结构修复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号