Engineering, procurement and construction (EPC) project management for reducing cost and time: A case study of petrochemical plant

机译:降低成本和时间的工程,采购和建设(EPC)项目管理:以石化厂为例

获取原文
获取原文并翻译 | 示例

摘要

At present, EPC project is one of hiring contracts for engineering design and construction of petrochemical plant. EPC project management is management under the lump-sum contract or stipulated sum contract of which the owner has essentially assigned all the risks to the contractor, who in turn can be expected to ask for a higher markup to take care of unforeseen contingencies. Generally, complexities of project activity are the main factor in project management. Therefore, effective project scheduling is the important method to reduce cost and time. The Program Evaluation and Review Technique (PERT) is basically a project scheduling management and control tool are widely used for planning and coordinating each activity in large-scale project. The Critical Path Method (CPM) is used extensively to find the longest path in the network diagram or the shortest duration in which the project can be completed. The researcher has aimed to apply PERT and CPM with simulation software add-in Crystal Ball in MS Excel to develop the optimal method for increasing certainty of project finished and reducing time of complexities project duration. To minimize project duration, overall monthly project management cost will be decreased. The finding of this paper showed that using PERT and CPM applied with simulation software add-in Crystal Ball in MS Excel in scheduling project could minimize project duration from 356 days to 312 days and maximize certainty of project finished from 24.49% to approach 100%.
机译:目前,EPC项目是石化厂工程设计和施工的承包合同之一。 EPC项目管理是根据总价合同或规定总价合同进行的管理,其中业主已将所有风险基本上分配给了承包商,而承包商又可以要求更高的加价幅度,以应对不可预见的意外情况。通常,项目活动的复杂性是项目管理中的主要因素。因此,有效的项目进度安排是减少成本和时间的重要方法。程序评估和评审技术(PERT)基本上是一种项目进度管理和控制工具,广泛用于大型项目的计划和协调。关键路径法(CPM)广泛用于在网络图中查找最长的路径或可以完成项目的最短时间。研究人员旨在将PERT和CPM与MS Excel中的模拟软件外接Crystal Ball一起应用,以开发出最佳方法来提高项目完成的确定性并减少复杂的项目时间。为了最大程度地缩短项目工期,将减少总体每月项目管理成本。本文的发现表明,在计划项目中使用PERT和CPM并结合MS Excel中的Crystal Ball附加仿真软件来安排项目可以将项目工期从356天缩短到312天,并使项目完成的确定性从24.49%最大化到接近100 \\%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号