Innovation program deployment for industries with irreversible processes

机译:具有不可逆过程的行业的创新计划部署

获取原文
获取原文并翻译 | 示例

摘要

Innovation processes and methods have taken center stage in many organizations as companies begin to evaluate new ways to deliver growth and maintain a competitive edge. Specifically, the proliferation of methods originating in software development (agile) and product development (design thinking) put pressure on organizations to dedicate resources to apply these methods, irrespective of industry. The challenge is that innovation program deployment is being mistakenly compared to the relative ubiquitous deployment of Six Sigma programs over the past decade. This is most apparent in industries such as Construction, namely mega-project construction, that face irreversible processes (concrete curing), risk (both life-critical and business), and elongated project cycles. To address this challenge, companies need to recognize limitations to agile methods as well as the impact of project time to the delivery of innovations. For example, a multi-billion-dollar rail project may take several years to deliver, during which technology advancements can change dramatically and project agency issues can impact the implementation of solutions to make the next job. Bechtel recently deployed an innovation program that addresses this alignment issue by providing a “fail-safe, fail-fast, fail-forward” process that is matched to a centralized fund for innovation. This paper presents key considerations for the deployment of a robust and scalable innovation program that maintains the ad-vantages of design thinking and speed of development for industries with similar challenges.
机译:随着公司开始评估新方法以实现增长并保持竞争优势,创新流程和方法已成为许多组织的中心议题。具体来说,源于软件开发(敏捷)和产品开发(设计思维)的方法的激增,给组织施加了压力,要求它们投入资源以应用这些方法,而与行业无关。面临的挑战是,与过去十年中相对普遍地部署的六西格玛计划相比,创新计划的部署是错误的。这在诸如建筑(即大型项目建设)这样的行业中最为明显,因为该行业面临着不可逆转的过程(混凝土固化),风险(对生命至关重要和对业务至关重要)以及延长的项目周期。为了应对这一挑战,公司需要认识到敏捷方法的局限性以及项目时间对创新交付的影响。例如,一个数十亿美元的铁路项目可能要花费数年才能交付,在此期间,技术进步可能会发生巨大变化,并且项目代理机构的问题可能会影响解决方案的实施,从而使下一份工作成为可能。 Bechtel最近部署了一项创新计划,该计划通过提供与集中式创新基金相匹配的“自动防故障,快速故障,故障转移”流程来解决这一一致性问题。本文提出了部署健壮且可扩展的创新计划的主要注意事项,该计划在面临类似挑战的行业中保持设计思想和发展速度的优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号