首页> 外文会议>2017 IEEE International Conference on Power, Control, Signals and Instrumentation Engineering >Modeling of the labour force redistribution in investment projects with account of their delay
【24h】

Modeling of the labour force redistribution in investment projects with account of their delay

机译:考虑投资项目延迟的劳动力再分配模型

获取原文
获取原文并翻译 | 示例

摘要

The mathematical model of the labour force redistribution in investment projects is presented in the article. The redistribution mode of funds, labour force in particular, according to the equal risk approach applied to the loss of some assets due to delay in all the investment projects is provided in the model. The sample of the developed model for three investment projects with the specified labour force volumes and their defined unit costs at the particular moment is given.
机译:本文介绍了投资项目中劳动力再分配的数学模型。该模型提供了资金的重新分配模式,尤其是劳动力的重新分配模式,该方法适用于由于所有投资项目的延误而导致的某些资产损失的均等风险方法。给出了在特定时刻具有指定劳动力数量及其定义的单位成本的三个投资项目的已开发模型的样本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号