首页> 外文会议>2017 IEEE Global Internet of Things Summit >A performance and cost evaluation of combining OPC-UA and Microsoft Azure IoT Hub into an industrial Internet-of-Things system
【24h】

A performance and cost evaluation of combining OPC-UA and Microsoft Azure IoT Hub into an industrial Internet-of-Things system

机译:将OPC-UA和Microsoft Azure IoT中心结合到工业物联网系统中的性能和成本评估

获取原文
获取原文并翻译 | 示例

摘要

The expected monetary costs and response time performance is important information to know before deploying an industrial Internet-of-Things system. The system investigated in this paper is built up by combining the Open Plant Communication Universal Architecture and the Microsoft Azure Internet-of-Things Hub. We consider a real life industrial scenario that remotely monitors a piece of industrial equipment consisting of 1500 sensors, of which 600 update their values every second. The measured results show that the response times for a fiber based Internet connection was on average 770 ms with a standard deviation of 330 ms and the same measurements on a mobile internet connection was on average 1150 ms with a standard deviation of 340 ms. Cost wise, the investigated scenario fits within the most expensive price plan for the IoT hub and ends in a total of just over $5000 per month for the whole cloud service.
机译:预期的金钱成本和响应时间性能是在部署工业物联网系统之前需要了解的重要信息。本文研究的系统是通过组合开放工厂通信通用体系结构和Microsoft Azure物联网中心而构建的。我们考虑一种现实生活中的工业场景,该场景远程监视由1500个传感器组成的工业设备,其中每秒600个更新其值。测量结果表明,基于光纤的Internet连接的响应时间平均为770 ms,标准差为330 ms,而对移动Internet连接的相同测量的平均时间为1150 ms,标准差为340 ms。在成本方面,所研究的方案适合于IoT中心最昂贵的价格计划,整个云服务的总费用每月仅略高于5000美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号