【24h】

Cyclic train timetabling model for high speed railway

机译:高速铁路循环列车时间表模型

获取原文
获取原文并翻译 | 示例

摘要

The cyclic train timetabling problem is studied in order to enhance the feasibility of the periodic event scheduling problem (PESP) model. First, we use the variable trip time constraints to replace the fixed trip time constraints, and the train acceleration and deceleration times are introduced into the trip time constraints. Then we provide the arrival safety constraints and departure safety constraints to take place of the original safety constraints in the PESP model. In order to reduce the solving time, we introduce a cutting plane into the new model. The proposed model is implemented using CPLEX 12.5, and the effectiveness is further examined through a case study.
机译:为了提高周期性事件调度问题(PESP)模型的可行性,研究了循环列车的时间表问题。首先,我们使用可变的行程时间约束来代替固定的行程时间约束,并将列车的加速和减速时间引入到行程时间约束中。然后,我们提供了到达安全约束和出发安全约束,以代替PESP模型中的原始安全约束。为了减少求解时间,我们在新模型中引入了切割平面。所提出的模型是使用CPLEX 12.5实施的,并且通过案例研究进一步验证了其有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号