【24h】

Optimized maintenance scheduling considering customer sensitivity to service interruptions

机译:考虑客户对服务中断的敏感性,优化维护计划

获取原文
获取原文并翻译 | 示例

摘要

Regular grid maintenance work might cause service interruption and consequently result in the economic loss of electricity end-use consumers. In order to maintain the service quality each utility tries to minimize customers' economic losses due to the monthly maintenance work. This paper firstly proposed an evaluation model to quantity the customer sensitivity to service interruption such that customers with different sensitivity values are compensated by different electricity loss price. The sensitivity value is calculated considering four variations: the average loading level, the customer importance level, the request for non-interrupted services and the historic customer complaint information. After then an optimal model solved by mix integer programming (MIP)method is proposed to minimize the total electricity loss cost due to power outage during the maintenance work. It can be obtained from the case simulation results that the economic loss of customers due to the maintenance work has been reduced after applying the optimization method to the maintenance scheduling.
机译:定期的电网维护工作可能会导致服务中断,从而导致最终用电用户的经济损失。为了维持服务质量,每个公用事业公司都试图将由于每月维护工作而给客户带来的经济损失降至最低。本文首先提出了一种评估模型,以量化客户对服务中断的敏感度,从而使具有不同敏感度值的客户得到不同的电价损失补偿。敏感度值是根据四个变化来计算的:平均负载水平,客户重要性水平,对不间断服务的请求以及历史客户投诉信息。在此之后,提出了一种通过混合整数规划(MIP)方法求解的最优模型,以使维护工作期间因停电而造成的总电力损失成本降至最低。从实例仿真结果可以看出,将优化方法应用于维修调度后,减少了维修工作给客户带来的经济损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号