With more and more HVDC transmission projects built and becoming operational, more issues are emerging. The increasing scarcity of land resources narrows down the choice of sites for ground electrodes and makes site selection ever difficult. Studies on the deep well grounding technique show that the currents flowing into the earth can be brought far below the surface and the line corridor and land use can be significantly reduced. High altitude and high-intensity earthquakes present major challenges to the seismic performance of high voltage equipment in converter stations, and therefore, various types of equipment require testing and simulation for verification of seismic performance, and equipment that is able to meet the seismic performance requirements needs to be developed. In addition, to enable flexible electric power dispatching, high security and stability, and DC interconnected power system, flexible multi-terminal HVDC technologies need to be promoted with great efforts.
机译:随着越来越多的高压直流输电项目的建立和投入运行,越来越多的问题出现。土地资源的日益匮乏缩小了接地电极的选址范围,使选址变得越来越困难。对深井接地技术的研究表明,流入地下的电流可以带到地表以下,并且可以大大减少线路走廊和土地使用。高海拔和高强度地震对换流站高压设备的抗震性能提出了重大挑战,因此,各种类型的设备需要进行测试和模拟以验证抗震性能,并且能够满足抗震性能要求的设备需要发展。另外,为了实现灵活的电力分配,高安全性和稳定性以及直流互连的电力系统,需要大力推广灵活的多端HVDC技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号