首页> 外文会议>2015 IEEE PES Innovative Smart Grid Technologies Latin America >Description of the simulator developed for the new RAS to be installed in the power system of Uruguay
【24h】

Description of the simulator developed for the new RAS to be installed in the power system of Uruguay

机译:为要在乌拉圭电力系统中安装的新RAS开发的模拟器的说明

获取原文
获取原文并翻译 | 示例

摘要

In electric power systems there are contingencies that can cause overload of any equipment, angular and voltage stability problems and frequency stability issues due to imbalances between load and generation. Most of those contingencies require disconnecting load to ensure the stability of the system and the integrity of the equipment. In most cases disconnection should be performed so quickly that it is possible only automatically. Such solutions are commonly referred by the acronym RAS, which means “Remedial Action Scheme”. UTE is currently implementing a solution of RAS [1] type to protect the network against the most severe contingencies.
机译:在电力系统中,由于负载和发电之间的不平衡,可能会引起任何设备过载,角度和电压稳定性问题以及频率稳定性问题的意外事件。这些突发事件中的大多数都需要断开负载以确保系统的稳定性和设备的完整性。在大多数情况下,断开的速度应如此之快,以至于只能自动进行。此类解决方案通常以首字母缩写词RAS来指代,意思是“补救措施方案”。 UTE当前正在实施RAS [1]类型的解决方案,以保护网络免受最严重的突发事件的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号