首页> 外文会议>2014 IEEE PES Tamp;D Conference and Exposition >Risk-based asset management optimization
【24h】

Risk-based asset management optimization

机译:基于风险的资产管理优化

获取原文
获取原文并翻译 | 示例

摘要

This paper describes a risk-based approach developed by Toronto Hydro-Electric System Limited (THESL) for optimizing and justifying asset management (AM) decisions related to medium-voltage electrical distribution systems. This approach balances the risk of in-service asset failures against the capital expenditures required to mitigate these risks in order to identify the optimal scope and timing of investments into aging infrastructure. At a broader level, this approach has been applied as part of a business case evaluation process, whereby the reductions in total cost of ownership — including asset risk, non-asset risk and maintenance costs, are compared to the overall investment costs to maximize the net present value (NPV) of investments.
机译:本文介绍了多伦多水电系统有限公司(THESL)开发的一种基于风险的方法,用于优化和证明与中压配电系统有关的资产管理(AM)决策。这种方法将服务资产故障的风险与缓解这些风险所需的资本支出进行平衡,以便确定对老化的基础架构进行投资的最佳范围和时机。在更广泛的层面上,此方法已被用作业务案例评估流程的一部分,该方法将总拥有成本(包括资产风险,非资产风险和维护成本)的减少与总投资成本进行了比较,以最大限度地提高投资的净现值(NPV)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号