首页> 外文会议>2014 IEEE International Conference on System Science ang Engineering >A study of resource constraint project scheduling problem for energy saving
【24h】

A study of resource constraint project scheduling problem for energy saving

机译:节能资源约束项目调度问题研究

获取原文
获取原文并翻译 | 示例

摘要

In terms of energy consumption, the environment surrounding the manufacturing industries has become considerably strict. As a framework containing many production scheduling problems in manufacturing industries, a great deal of researches on the resource-constrained project scheduling problem (RCPSP) has been performed. We have proposed a RCPSP formulation called RCPSP/π;RC, which can deal with realistic energy constraints such as power restriction during peak hours, contract demand, and energy consumption during the setup operations. In this paper, we evaluate RCPSP/π;RC through computational experiments. The proposed method is compared with two heuristic rules. Results of computational experiments show the effectiveness of the proposed method.
机译:在能源消耗方面,制造业周围的环境已变得相当严格。作为包含许多制造业生产调度问题的框架,已经对资源受限的项目调度问题(RCPSP)进行了大量研究。我们提出了一种称为RCPSP /π; RC的RCPSP公式,该公式可以处理现实的能源约束,例如高峰时段的功率限制,合同需求和设置操作期间的能耗。在本文中,我们通过计算实验评估了RCPSP /π; RC。将该方法与两个启发式规则进行了比较。计算实验结果表明了该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号