首页> 外文会议>2013 Fourth International Conference on Digital Manufacturing and Automation >Design of a Subway Station Crossing Urban Trunk Road by Open Cut and Tunneling Method
【24h】

Design of a Subway Station Crossing Urban Trunk Road by Open Cut and Tunneling Method

机译:明挖隧道法穿越城市干线的地铁站设计

获取原文
获取原文并翻译 | 示例

摘要

The design of a subway station that crosses an urban trunk road for automobiles in Chengdu city is summarized in this paper. In view of its special location and structural design, the subway station is built in combination with open cut and tunneling method, its structure consists of three different parts, which includes two reinforced concrete frame structures and a bored tunnel with side platforms. The frame structure is built with open cut method, but the bored tunnel with platform is built by means of tunneling method. The structure and construction process are both summarized in the paper. The scenario may provide guidance for the design and construction of such peculiar subway station under similar circumstances.
机译:本文总结了成都市穿越汽车主干道的地铁车站的设计。鉴于其特殊的位置和结构设计,该地铁站是结合明挖和掘进法建造的,其结构由三个不同部分组成,包括两个钢筋混凝土框架结构和一个带侧平台的钻孔隧道。框架结构采用明挖法建造,而带平台的钻孔隧道则采用隧道法建造。本文对结构和施工过程进行了总结。该场景可以为类似情况下这种特殊地铁站的设计和施工提供指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号