首页> 外文会议>2013 4th IEEE/PES Innovative Smart Grid Technologies Europe (ISGT EUROPE), >Smart grid ADR aggregation delay model on large-scale distributed building HVAC facilities
【24h】

Smart grid ADR aggregation delay model on large-scale distributed building HVAC facilities

机译:大型分布式建筑HVAC设施的智能电网ADR聚合延迟模型

获取原文
获取原文并翻译 | 示例

摘要

In the future, Automated Demand Response (ADR) Aggregators will be expected to gather power curtailments as quickly as possible. In this research, the total delay for the ADR aggregation of large-scale building HVAC facilities was evaluated by test-bench experiments. A power curtailment delay model of 100 buildings was constructed by using time-series data measured from actual office building HVAC facilities. Our test-bench experiments have shown that it took 5.8 minutes on the average to gather power curtailments of 5 MW from the delay model emulator of 100 buildings assuming conventional Watt-hour power metering and the Internet firewall policy. Approximately 70% of the delay has come from stochastic timing differences between the Aggregator's command setting and all the curtailment result reports that had to be invoked periodically from each building's BEMS gateway.
机译:将来,预计自动需求响应(ADR)聚合器将尽快收集功耗限制。在这项研究中,通过试验台实验评估了大型建筑HVAC设施的ADR聚合总延迟。通过使用从实际办公楼HVAC设施测得的时间序列数据,构建了100座建筑物的限电延迟模型。我们的测试平台实验表明,假设采用常规的瓦特小时电表和Internet防火墙策略,从100座建筑物的延迟模型仿真器中收集5兆瓦的功率削减平均需要5.8分钟。延迟的大约70%来自聚集器的命令设置与必须从每个建筑物的BEMS网关定期调用的所有缩减结果报告之间的随机时序差异。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号