首页> 外文会议>CIRED 2012;Workshop on Integration of Renewables into the Distribution Grid >Optimal short term operational planning for distribution networks
【24h】

Optimal short term operational planning for distribution networks

机译:配电网络的最佳短期运营计划

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Short term operational electricity distribution network planning (to be distinguished from long-term planning) involves activities aimed at anticipating network constraints and improving network performance within the existing level of basic infrastructure. This concept is commonly used by Transmission Network Operators in order to anticipate and optimize their network operating point at a national and regional level. Based on the development of local load and generation forecasts tools, for which accurate meteorological forecast is required, short-term operational planning decisions in distribution networks will be made in the near future of operational time (Week-1, Day-1). In addition, real-time network automation functions are used in order to solve the few problems which could not be anticipated. This paper introduces EDF R&D and ERDF's vision of the French Distribution System Evolution and presents the DSO induced needs. The voltage control function is used as an example in order to describe the different time sequences.
机译:短期运营配电网络规划(与长期规划不同)涉及旨在预测网络约束并在现有基础设施级别内改善网络性能的活动。传输网络运营商通常使用此概念,以便在国家和地区级别上预测和优化其网络运行点。基于需要精确的气象预报的本地负荷和发电量预测工具的开发,将在不久的运营时间(第1周,第1天)中做出配电网络中的短期运营计划决策。另外,使用实时网络自动化功能来解决一些无法预料的问题。本文介绍了EDF R&D和ERDF对法国配电系统演进的看法,并提出了DSO引发的需求。以电压控制功能为例,以描述不同的时序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号