首页> 外文会议>2012 Workshop on Integration of Renewables into the Distribution Grid >RESULTS ASSESSMENT OF TWO INSTALLED DGS IN MASHHAD ELECTRIC ENERGY DISTRIBUTION COMPANY
【24h】

RESULTS ASSESSMENT OF TWO INSTALLED DGS IN MASHHAD ELECTRIC ENERGY DISTRIBUTION COMPANY

机译:马什哈德配电公司安装的两个DGS的结果评估

获取原文
获取原文并翻译 | 示例

摘要

The paper reports on the technical,economical and electricity generation capacity assessment of two installed and grid connected renewable Distributed Generation (DG) systems in Mashhad; one landfill gas system and one wind farm.Theoretical models for electricity generation potential that are developed in Homer package are compared with real world measured data collected after implementation and working for two years.The results of assessment are used to determine the viability of such DGs in Mashhad electricity distribution network.
机译:该文件报告了马什哈德两个已安装并网连接的可再生分布式发电系统的技术,经济和发电能力评估; 1个垃圾填埋气系统和1个风电场。将荷马一揽子计划中开发的发电潜力理论模型与实施和工作两年后收集的实际测量数据进行比较,评估结果用于确定此类DG的可行性。在马什哈德配电网。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号