首页> 外文会议>2012 Workshop on Integration of Renewables into the Distribution Grid >EMBEDDED GENERATION PLANNING IN PRESENCE OF RENEWABLE RESOURCES USING A PROBABILISTIC MULTI-OBJECTIVE OPTIMIZATION APPROACH
【24h】

EMBEDDED GENERATION PLANNING IN PRESENCE OF RENEWABLE RESOURCES USING A PROBABILISTIC MULTI-OBJECTIVE OPTIMIZATION APPROACH

机译:使用概率多目标优化方法的可再生资源嵌入式发电计划

获取原文
获取原文并翻译 | 示例

摘要

So far,Distributed Generations (DGs) have been vast put in practice due to their evident roles in both technical and economical performance of power distribution systems.This paper investigates the presence of renewable energies once DG integration to the network has to be planned.A multiobjective optimization approach has been presented where the risk costs,the share of private investments,and imposed costs are considered as the main objectives.Performancebased regulation is also incorporated as an incentive mechanism in the DG planning process in presence of renewable energy sources (RES).The proposed scheme is adapted to the 37-Bus IEEE standard test system and the anticipated efficiency of the proposed method is well verified by then.
机译:到目前为止,由于分布式发电(DGs)在配电系统的技术和经济性能中都具有明显的作用,因此已被广泛应用。本文研究了一旦计划将DG集成到电网中后可再生能源的存在。提出了多目标优化方法,其中将风险成本,私人投资份额和强制成本视为主要目标。在存在可再生能源(RES)的DG规划过程中,还将基于绩效的监管作为激励机制提出的方案适用于37总线IEEE标准测试系统,到那时为止,该方法的预期效率得到了很好的验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号