首页> 外文会议>Asia-Pacific Power and Energy Engineering Conference;APPEEC >A Novel Unit Commitment Method Considering Power System Reliability
【24h】

A Novel Unit Commitment Method Considering Power System Reliability

机译:考虑电力系统可靠性的新型机组组合方法

获取原文
获取原文并翻译 | 示例

摘要

A new method is proposed for the incorporation of the system reliability and economy in the solution of the short-term unit commitment problem. The cost of spinning reserve is included in the total operating cost. To minimize the total cost with an acceptable reliability level, both fuel consumption and unavailability of the generating units have been taken into consideration. The augmented Lagrangian method and the Broyden-Fletcher-Goldfarb-Shanno algorithm are used to solve the dynamic economic dispatch subproblem. The evaluation of the required reserve capacity is performed by implementing reliability constraints, based on the loss of load probability index. Numerical results on the 26 generating units test system have proven the efficiency of the proposed method.
机译:提出了一种解决系统短期可靠性问题的系统可靠性和经济性的新方法。纺纱储备的成本包括在总运营成本中。为了以可接受的可靠性水平使总成本最小化,已经考虑了燃料消耗和发电机组的不可用性。扩展拉格朗日方法和Broyden-Fletcher-Goldfarb-Shanno算法用于解决动态经济调度子问题。基于负载概率指标的损失,通过实施可靠性约束条件来执行对所需备用容量的评估。在26个发电机组测试系统上的数值结果证明了该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号