Optimization of wind power capacity in an electricity grid

机译:电网中风电容量的优化

获取原文

摘要

Within a probabilistic framework, the wind power capacity planning problem is formulated as a chance constrained programming (CCP) problem containing random variables and uncertain constraints. The objective is to maximize the net profit with limitations of the grid system considered. Penalty costs of wind curtailment and load shedding are accounted into the cost evaluation. The system limitations include generation limitations, interconnection capacity constraints, wind power generation penetration limit and system reliability requirement. The practicality and versatility of the proposed approach is verified by the determination of optimal wind power capacity for a typical power system. With the proposed approach, a clear insight into the planning of wind farm capacity in the electricity grid could be investigated to ensure development of an efficient wind market.
机译:在概率框架内,将风电容量规划问题表述为包含随机变量和不确定约束的机会约束规划(CCP)问题。目的是在考虑电网系统限制的情况下使净利润最大化。风电削减和减载的罚款成本已计入成本评估中。系统限制包括发电限制,互连容量限制,风力发电渗透限制和系统可靠性要求。通过确定典型电力系统的最佳风电容量,验证了所提方法的实用性和多功能性。通过提议的方法,可以调查对电网中风电场容量规划的清晰见解,以确保发展有效的风能市场。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号