首页> 外文会议>2012 20th International Conference on Electrical Machines. >Optimization of the start-up time of a variable speed pump-turbine unit in pumping mode
【24h】

Optimization of the start-up time of a variable speed pump-turbine unit in pumping mode

机译:优化抽水模式下的变速水轮机机组的启动时间

获取原文
获取原文并翻译 | 示例

摘要

This paper presents the start-up and synchronization procedures of large variable-speed pump-turbine units in pumping mode. These procedures applied to a doubly-fed induction motor-generator with three-level voltage source inverters VSI cascade in the rotor side, can be achieved without any supplementary equipment, for instance without an autotransformer connected to the rotor. The control strategy used in the start-up procedure and based on a stator flux oriented control is summarized as well as different steps in order to reach the minimal speed required for synchronization. An optimization of the start-up time can be achieved by a modification of the modulation type of the converters. Simulated results obtained for two variable-speed pump-turbine units of 340 MW and 250 MW are presented and discussed.
机译:本文介绍了大型变速泵水轮机机组在抽水模式下的启动和同步过程。这些步骤适用于在转子侧具有三级电压源逆变器VSI级联的双馈感应电动发电机,无需任何辅助设备即可实现,例如,无需在转子上连接自耦变压器。总结了启动过程中使用的控制策略以及基于定子磁链定向的控制以及不同的步骤,以达到同步所需的最小速度。可以通过修改转换器的调制类型来优化启动时间。介绍并讨论了两个分别为340 MW和250 MW的变速水泵水轮机组获得的模拟结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号