首页> 外文会议>2011 rapid excavation and tunneling conference >A CUT-AND-COVER TUNNEL THROUGH LAKE ELIZABETH BART WARM SPRINGS EXTENSION PROJECT IN FREMONT, CALIFORNIA
【24h】

A CUT-AND-COVER TUNNEL THROUGH LAKE ELIZABETH BART WARM SPRINGS EXTENSION PROJECT IN FREMONT, CALIFORNIA

机译:通过加利福尼亚州弗里蒙特伊丽莎白·巴特·温特湖扩建项目开挖和覆盖的隧道

获取原文
获取原文并翻译 | 示例

摘要

A cut-and-cover tunnel section of subway for the Bay Area Rapid Transit Districtrn(BART) is under construction from south of BART’s Fremont Station through LakernElizabeth in Fremont, CA. This tunnel is located near the Hayward Fault and in a waterrnstorage supply aquifer. The unique hydrogeologic conditions of the project site havernposed challenges to the project in terms of design, constructability and control of constructionrnscheduling and budget. This paper will describe the design and constructionrnof the cutoff walls and the grout plug from the designer’s and construction manager’srnview points.
机译:湾区捷运区(BART)的地铁明挖隧道段正在建设中,从BART的Fremont车站南侧经过加利福尼亚州Fremont的LakernElizabeth。该隧道位于海沃德断层附近,在蓄水供水层中。项目现场独特的水文地质条件给项目带来了设计,可施工性以及施工进度和预算控制方面的挑战。本文将从设计师和施工经理的观点出发,介绍隔断墙和灌浆塞的设计和施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号