首页> 外文会议>2011 rapid excavation and tunneling conference >DELTA HABITAT CONSERVATION AND CONVEYANCE PROGRAM: 'THE PIPELINE/TUNNEL OPTION'
【24h】

DELTA HABITAT CONSERVATION AND CONVEYANCE PROGRAM: 'THE PIPELINE/TUNNEL OPTION'

机译:三角洲人居保护与便利计划:“管道/隧道选项”

获取原文
获取原文并翻译 | 示例

摘要

The Delta Habitat Conservation and Conveyance Program (DHCCP) “Pipeline/rnTunnel Option” is one of the conveyance concepts by the Department of WaterrnResources (DWR) that is being considered in the environmental review of the BayrnDelta Conservation Plan. This conveyance would bring water from the Sacramentornand San Joaquin Rivers to the State and Federal pumping plants in the south Delta.rnThe proposed project alignment is 43 miles long and would convey a maximum ofrn15,000 cfs. The project includes intakes, pumping stations, forebays, sedimentationrnbasins and tunnels. The main tunnels are 37 miles of twin 33-foot ID and are anticipatedrnto be constructed in variable soils at depths below 120 feet. This paper describesrnthe DHCCP “Pipeline/Tunnel Option.”
机译:三角洲人居保护与运输计划(DHCCP)的“管道/ rnTunnel选项”是水资源部(DWR)的运输概念之一,正在对BayrnDelta保护计划进行环境审查。这种输送将把水从萨克拉曼多恩河和圣华金河带到南部三角洲的州和联邦抽水厂。拟议中的项目路线长43英里,最大输送量为15,000 cfs。该项目包括进水口,泵站,前湾,沉淀池和隧道。主要的隧道长37英里(33英尺),内径为33英尺,预计将在深度小于120英尺的可变土壤中建造。本文介绍了DHCCP的“管道/隧道选项”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号