GEOTECHNICAL BASELINE FOR THE SR 99 BORED DESIGN-BUILD ALASKAN WAY TUNNEL, SEATTLE, WASHINGTON

机译:SR 99钻孔设计的ALASKAN WAY隧道的岩土基准线,西雅图,华盛顿

获取原文
获取原文并翻译 | 示例

摘要

Washington State Department of Transportation has awarded a contract to designrnand construct a 17.5 m (57.5 foot) diameter bored tunnel at depths up to 60 m (200 feet)rnin the glacial soil under downtown Seattle, Washington. Geotechnical investigationsrnresulted in a baseline report, data report and characterization report. The GeotechnicalrnBaseline Report (GBR) and Geotechnical Data Report(GDR) were provided as part ofrnthe contract documents and were an integral component of the risk sharing aspects ofrnthe design-build contract. An initial assessment of over 300 buildings was conductedrnto identify those most sensitive to settlement. Mitigation measures include compensationrngrouting for specific buildings. Extensive construction monitoring is planned. Thernproject also includes cut-and-cover construction at south and north portals for transitionrnbetween side-by-side roadways and stacked configuration roadway in the boredrntunnel. An initial assessment of more than 300 buildings along potential tunnel routesrnwas conducted to identify those most sensitive to settlement. Prequalification of tunnelrncontractor teams started in late 2009 and resulted in two proposals. The Seattle TunnelrnPartners (Dragados and HNTB) were awarded the project for $1,089,700,002 million.rnThis paper will discuss the considerations that went into development of the GBR, constructionrnmonitoring and technical requirements for the bored tunnel.
机译:华盛顿州交通运输部已授予一份合同,在华盛顿西雅图市中心下的冰川土壤中设计和建造一条直径为17.5 m(57.5英尺)的钻孔隧道,深度可达60 m(200英尺)。岩土工程调查得出基线报告,数据报告和特征报告。岩土工程基线报告(GBR)和岩土工程数据报告(GDR)作为合同文件的一部分提供,并且是设计建造合同风险分担方面不可或缺的组成部分。初步评估了300多座建筑物,以找出对沉降最敏感的建筑物。缓解措施包括对特定建筑物进行补偿灌浆。计划进行广泛的施工监控。该项目还包括在南部和北部入口处的明挖覆盖式施工,以在并列巷道和钻孔隧道中的堆叠式构造巷道之间过渡。对潜在隧道路线上的300多栋建筑物进行了初步评估,以找出对沉降最敏感的建筑物。隧道承包商团队的资格预审始于2009年底,提出了两项​​建议。西雅图隧道合作伙伴(Dragados和HNTB)获得了10,897,002.00亿美元的资金。本文将讨论GBR的开发考虑因素,施工监控以及钻孔隧道的技术要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号