首页> 外文会议>2011 46th International Universities' Power Engineering Conference >Chinese Offshore Wind Farm Development and Its Function in Meeting Government Renewable Target
【24h】

Chinese Offshore Wind Farm Development and Its Function in Meeting Government Renewable Target

机译:中国海上风电场的发展及其在实现政府可再生目标中的作用

获取原文
获取原文并翻译 | 示例

摘要

This paper carries out thorough investigation into the emerging Chinese offshore wind development. References have been made to international experiences (UK in particular) and the previous experiences from on-shore wind development in China to understand the trend and the future of the Chinese offshore wind sector. It summarized that the Chinese offshore wind development has technical and economical difficulties to take off. However, it is certain that the offshore wind will be essential part of Chinese governmental strategy to meet its 2015 and 2020 renewable targets. The paper further points out that the potential of delivering more than 2000MW offshore (including Intertidal wind) by 2015.
机译:本文对新兴的中国海上风电发展进行了深入研究。参考了国际经验(尤其是英国)以及中国在岸风电发展的先前经验,以了解中国近海风电行业的趋势和未来。总结认为,中国海上风电发展存在技术和经济困难。但是,可以肯定的是,海上风电将成为中国政府实现其2015年和2020年可再生能源目标的战略的重要组成部分。该文件进一步指出,到2015年,海上发电能力(包括潮间带风能)将超过2000兆瓦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号