Study on Supporting Key Technology of Driving Roadway along Goaf on Down Original Site in Island Light Sublevel Caving Face

机译:孤岛轻型工作面放空沿原煤巷掘进巷道支护关键技术研究

获取原文

摘要

The concept of driving roadway along goaf on "down original site" was proposed based on analysis of the formation condition of island pillar in 2123 face of Shigejie mine. The reasonable width of narrow pillar for roadway protection was 2.0 m by calculation, and the position of driving roadway along goaf on "down original site" that the mining roadway in neighboring face was arranged down the original abandoned roadway of the last district and was determined through key block, internal and external stress field and limit equilibrium theory. Joint supporting form of ribs bolt, netting and shelf along goaf was designed through strength reinforced theory of roadway bolting supporting surrounding rock. Spacing and row distance of I-steel was 800×800 mm, glass steel bolting Φ18×2000 mm, rebar bolt Φ20×1500 mm, and spacing and row distance was 800x800 mm. Industrial field tests show that roadway layout and joint supporting method are feasible and effective in controling deformation of roadway surrounding rock, ensuring normal use of roadway during the mining period.
机译:通过对重葛街2123工作面岛柱形成条件的分析,提出了沿“下原址”沿空巷掘进巷道的概念。经计算,用于巷道防护的窄支柱的合理宽度为2.0 m,并确定了沿采空区的掘进巷道在“下原址”上的位置,该巷道的工作面是将相邻工作面中的采掘巷道布置在最后一个区域的原废弃巷道下并确定通过关键块,内外应力场和极限平衡理论。根据巷道锚固支护围岩的强度增强理论,设计了沿空巷肋,网和架子的联合支护形式。工字钢的间距和行距为800×800 mm,玻璃钢螺栓Φ18×2000 mm,钢筋螺栓Φ20×1500 mm,间距和行距为800x800 mm。工业现场试验表明,巷道布置及联合支护方法是控制巷道围岩变形,保证采矿期间巷道正常使用的可行有效方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号