Mitigating Cost and Schedule Risks onPower Generation Construction Projects

机译:降低发电建设项目的成本和进度风险

获取原文
获取原文并翻译 | 示例

摘要

Construction of power generation facilities is challenging and unique. Asrngovernments and businesses look to expand power generation facilities, meeting schedulernand cost goals given the small amount of qualified resources available will be an increasingrnchallenge. As a result, construction professionals have to be apprised of the increasingrnchallenges faced by contractors, subcontractors and suppliers in constructing alternativernenergy projects. Ideally, the bid price and schedule should account for the special needsrncontractors and suppliers may encounter on power projects regarding quality, submittals,rnscheduling and coordination, procurement, transportation, change orders, delays andrndisruptions, unforeseen conditions, nonconforming construction documents andrnmaterial/equipment fabrication. This article provides considerations for what contractorsrnand suppliers need to consider when preparing and negotiating costs, schedules andrncontracts for working on power generation construction projects.
机译:发电设施的建设具有挑战性和独特性。政府和企业希望扩大发电设施,达到时间表和成本目标,因为少量合格的可用资源将是日益严峻的挑战。结果,必须向建筑专业人士了解承包商,分包商和供应商在建设替代能源项目时面临的日益严峻的挑战。理想情况下,投标价格和时间表应考虑到特殊需求-承包商和供应商在电力项目上可能遇到的质量,提交,安排和协调,采购,运输,变更单,延误和中断,不可预见的条件,不合格的施工文件以及材料/设备制造等方面的特殊需求。本文提供了一些考虑因素,包括承包商和供应商在准备和谈判发电建设项目的成本,时间表和合同时需要考虑的事项。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号