【24h】

The Sanha LPG FPSO

机译:Sanha LPG FPSO

获取原文
获取原文并翻译 | 示例

摘要

The FPSO industry will soon have the first LPG FPSO inrnoperation. The SANHA LPG FPSO is the first gas relatedrnFPSO. With the installation of the LPG FPSO forrnChevronTexaco’s Sanha field development project offshorernAngola by April 2005, SBM will set a new benchmark forrnoffshore processing of LPG. The LPG FPSO will receive LPGrnfrom the Sanha Condensate Complex and several productionrnplatforms via two subsea pipelines and flexible risers. Eachrnstream will be pressurized at near-ambient temperature whenrnloaded on the LPG FPSO.rnOnboard the two streams will be comingled and thenrnseparated into butane and propane fractions by means ofrndistillillation, refrigerated, depressurized to athmosphericrnpressure and stored into the cargo tanks. The paper willrnaddress the main commercial, technical and exectutionrnchallenges that the project team has faced and highlight thernkey success factors as well as “lessons learnt”.
机译:FPSO行业很快将有首个液化石油气FPSO失效。 SANHA LPG FPSO是第一个与气体相关的FPSO。到2005年4月,雪佛龙德士古石油公司在安哥拉离岸的LPG FPSO安装完毕后,SBM将为离岸石油气加工设定新的基准。液化石油气FPSO将通过两条海底管道和柔性立管从Sanha冷凝物厂和数个生产平台接收LPGrn。装在LPG FPSO上时,每条物流将在接近环境温度的条件下加压。板载两股物流将通过蒸馏,冷冻,减压至对流大气压的压力进行混合,然后分离为丁烷和丙烷馏分,然后存储到货舱中。本文将解决项目团队面临的主要商业,技术和执行挑战,并重点介绍成功的关键因素以及“经验教训”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号