首页> 外文会议>2002 International Joint Power Generation Conference, Jun 24-26, 2002, Scottsdale, Arizona >APPLYING NEW AND IMPROVED TECHNOLOGY TO AN EXISTING GENERATOR- DRIVE STEAM TURBINE
【24h】

APPLYING NEW AND IMPROVED TECHNOLOGY TO AN EXISTING GENERATOR- DRIVE STEAM TURBINE

机译:在现有的发电机驱动的汽轮机上应用改进的新技术

获取原文
获取原文并翻译 | 示例

摘要

There is growing pressure to reduce the pay back period of major capital expenditures, and in most cases, revamping existing turbomachinery provides more attractive economics than new equipment. Moreover, revamping existing power generation equipment with modern technology mitigates the expenses associated with obtaining new environmental licensing. Today, innovative application of technological advancements in mechanical and aero-thermodynamic design/ analysis methods combined with new manufacturing methods is yielding significant performance improvements. This paper details the revamping of a 36 MW generator-drive turbine that resulted in an eleven point improvement in steam rate. Details of the steampath thermodynamic design/ analysis methods, sealing, diaphragm construction, blade design and low-pressure steam path design, etc. are presented.
机译:减少主要资本支出的回收期的压力越来越大,并且在大多数情况下,与新设备相比,改造现有的涡轮机械提供的经济效益更高。此外,用现代技术改造现有的发电设备可减轻与获得新的环境许可有关的费用。如今,机械和空气热力学设计/分析方法中技术进步的创新应用以及新的制造方法正在带来显着的性能改进。本文详细介绍了36 MW发电机驱动式涡轮机的改造,该改造使蒸汽速率提高了11点。详细介绍了蒸汽路径热力学设计/分析方法,密封,隔膜结构,叶片设计和低压蒸汽路径设计等。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号