首页> 外文会议>2001 conference of Waste Management (WM);Annual Waste Management Symposium >PLANS FOR MANAGING HANFORD REMOTE-HANDLED TRANSURANIC WASTE
【24h】

PLANS FOR MANAGING HANFORD REMOTE-HANDLED TRANSURANIC WASTE

机译:汉福德远程透明废物管理计划

获取原文

摘要

The current Hanford Site baseline and life-cycle waste forecast predicts that approximately 1,000 cubicmeters of remote-handled transuranic (RH-TRU) waste will be generated by waste management andenvironmental restoration activities at Hanford. These 1,000 cubic meters, comprised of both transuranicand mixed transuranic (TRUM) waste, represent a significant portion of the total estimated inventory ofRH-TRU to be disposed of at the Waste Isolation Pilot Plant (WIPP).A systems engineering approach is being followed to develop a disposition plan for each RHTRU/TRUM waste stream at Hanford. A number of significant decision-making efforts are underway todevelop and finalize these disposition plans, including: development and approval of a RH-TRU/TRUMWaste Project Management Plan, revision of the Hanford Waste Management Strategic Plan, the HanfordSite Options Study (“Vision 2012”), the Canyon Disposal Initiative Record-of-Decision, and the HanfordSite Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (SW-EIS).Disposition plans may include variations of several options, including 1) sending most RH-TRU/TRUMwastes to WIPP, 2) deferrals of waste disposal decisions in the interest of both efficiency and integrationwith other planned decision dates and 3) disposition of some materials in place consistent withDepartment of Energy Orders and the regulations in the interest of safety, risk minimization, and cost.Although finalization of disposition paths must await completion of the aforementioned decisiondocuments, significant activities in support of RH-TRU/TRUM waste disposition are proceeding,including Hanford participation in development of the RH TRU WIPP waste acceptance criteria,preparation of T Plant for interim storage of spent nuclear fuel sludge, sharing of technology informationand development activities in cooperation with the Mixed Waste Focus Area, RH-TRU technologydemonstrations and deployments, and interface with EM Integration activities.
机译:当前的汉福德基地基线和生命周期废物预测预测,汉福德的废物管理和环境恢复活动将产生约1,000立方米的远程处理超铀(RH-TRU)废物。这1000立方米包含超铀和混合超铀(TRUM)废物,占将在废物隔离试验工厂(WIPP)中处置的RH-TRU估计总库存的很大一部分。在汉福德为每个HTRTU / TRUM废物流制定处置计划。正在制定和最终确定这些处置计划的许多重要决策工作,包括:RH-TRU / TRUM废物项目管理计划的开发和批准,Hanford废物管理战略计划的修订,HanfordSite方案研究(“ 2012年愿景” ”,Canyon处置计划决定记录和HanfordSite固体(放射性和有害)废物计划环境影响声明(SW-EIS)。处置计划可能包括多种选择的变体,其中包括1)发送大部分RH-TRU / TRUM向WIPP处置的废物,2)出于效率和与其他计划的决策日期的考虑而推迟废物处置决策,以及3)为了确保安全,最大程度地降低风险,按照能源部和法规的要求处置某些材料,尽管处置路径的定稿必须等待上述决定文件的完成,但为支持该决定而开展的重大活动RH-TRU / TRUM废物处置工作正在进行中,包括汉福德参与RH TRU WIPP废物接收标准的制定,用于废核燃料污泥的临时存储的T厂的准备,与混合废物关注点合作共享技术信息和开发活动区域,RH-TRU技术演示和部署,并与EM Integration活动交互。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号