首页> 外文会议>1st World Conference on Explosives amp; Blasting Technique, 1st, Sep 6-8, 2000, Munich/Germany >Standards, environmental regulations and consequences for tunnel blasting projects in urban areas in Sweden
【24h】

Standards, environmental regulations and consequences for tunnel blasting projects in urban areas in Sweden

机译:瑞典城市地区隧道爆破项目的标准,环境法规和后果

获取原文
获取原文并翻译 | 示例

摘要

The best method to minimise disturbances from traffic to the neighbourhood is probably to go underground. For obvious reasons this will cause vibrations, noise and other environmental effects which need very strict regulations and quality assurance in order to complete the work successfully. One project is "Southern Link", a part of a ring road system. The system of tunnels includes 16 kilometres of tunnels right beneath the south part of the city of Stockholm. At least 20.000 people will be or could be affected by different kinds of disturbances and pollution such as vibrations, noise, gas and groundwater. Another project is the "Arlanda Link". A new railway with three stations has been built under the existing and running Arlanda airport with its terminals. Authorities have carefully judged these projects, which cause complaints from neighbours due to disturbances. The blasting operations are professionally managed by the contractors and controlled by consultants to keep the regulations according to the Swedish standards, which are well described in the tender documents by risk analysis and technical descriptions. In spite of that, one conclusion is that it is not always possible to go underground without exceeding stipulated regulations with existing technique. Some of the regulations also double the cost of excavation.
机译:减少从交通到附近地区的干扰的最佳方法可能是进入地下。由于明显的原因,这会引起振动,噪音和其他环境影响,因此需要非常严格的规定和质量保证才能成功完成工作。一个项目是“ Southern Link”,这是环形道路系统的一部分。隧道系统包括斯德哥尔摩市南部下方16公里的隧道。至少有20.000人将受到或可能受到振动,噪声,气体和地下水等各种干扰和污染的影响。另一个项目是“ Arlanda Link”。在现有和运行中的Arlanda机场及其航站楼下,已修建了一条具有三个车站的新铁路。当局对这些项目进行了认真的判断,这些项目由于干扰而引起邻居的抱怨。爆破作业由承包商进行专业管理,并由顾问控制,以确保遵守瑞典标准,这些法规在投标文件中通过风险分析和技术说明得到了很好的描述。尽管如此,一个结论是,在不超过现有技术规定的规定的情况下,并非总是能够进入地下。一些规定还使开挖成本增加了一倍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号