ENERGETIC AND ENVIRONMENTAL ANALYSIS OF A NEW COGENERATIVE CONFIGURATION FOR THE WASTE TO ENERGY PLANT OF PIACENZA

机译:一种新的热电联产工厂的协同结构的能量和环境分析

获取原文
获取原文并翻译 | 示例

摘要

This study aims at estimating the energy and environmental performances of a new cogenerative configuration of the waste to energy (WTE) plant in Piacenza. At present, the plant is authorized to treat 120,000 t/y of waste, but this limit does not represent the full treatment capacity of the facility. To exploit the plant potential and, at the same time, to reduce total equivalent emissions of the WTE process, a cogenerative configuration has been proposed. In this new scenario a back pressure turbine would be installed in parallel to the existing one, in order to supply heat to the district heating network of Piacenza and the total amount of waste treated per year by the facility would be increased to 134,100 t. The increase of 14,100 t should be satisfied by industrial and commercial waste, which would otherwise go to landfill. To compare the cogenerative scenario with the current situation, the environmental impact for the two cases has been evaluated by means of a life cycle assessment methodology. The results of the analysis show that the new configuration can ensure significant energy and environmental benefits.
机译:这项研究的目的是评估皮亚琴察(Piacenza)废热发电(WTE)工厂新的热电联产配置的能源和环境绩效。目前,该工厂已被授权处理120,000吨/年的废物,但该限制并不代表该设施的全部处理能力。为了利用工厂的潜力,同时减少WTE工艺的总等效排放量,提出了一种热电联产配置。在这种新方案中,将与现有涡轮机并联安装一台背压式涡轮机,以便为皮亚琴察的区域供热网络供热,该设施每年处理的废物总量将增加到134,100吨。增加的14,100吨应通过工业和商业废物来满足,否则将被填埋。为了将热电联产情景与当前状况进行比较,已通过生命周期评估方法对这两种情况的环境影响进行了评估。分析结果表明,新配置可以确保显着的能源和环境效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号