首页> 外文会议>18th Conference on Ground Control in Mining, Aug 3-5, 1999, Morgantown, WV, USA >Mine Convergence When Using Mobile Roof Supports in Pillar Recovery
【24h】

Mine Convergence When Using Mobile Roof Supports in Pillar Recovery

机译:在柱式回收中使用移动式屋顶支架时,矿井会聚

获取原文
获取原文并翻译 | 示例

摘要

To date, there has been limited formal research dealing with the use of Mobile Roof Supports (MRS) for pillar recovery. This paper, which is a portion of a larger project, presents convergence data from 4 different mine case studies. MULSIM was used to create a numerical model. The resulting information from this model was then compared to the actual measured values. MULSIM was also employed to analyze the industry-accepted pillar/barrier layout for mining underground reserves with the Joy Highwall Mining System. This layout was examined for both a low cover and a high cover extreme.
机译:迄今为止,有关使用移动车顶支架(MRS)进行支柱回收的正式研究有限。本文是一个较大项目的一部分,提供了来自4个不同矿山案例研究的收敛数据。 MULSIM用于创建数值模型。然后将来自该模型的结果信息与实际测量值进行比较。 MULSIM还被用于通过Joy Highwall采矿系统分析行业认可的用于开采地下储备的支柱/屏障布局。对于低覆盖率和高覆盖率极端都检查了此布局。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号