【24h】

High Temperature Leak Before Break Assessments

机译:断裂前高温泄漏评估

获取原文
获取原文并翻译 | 示例

摘要

The use of Leak Before Break (LbB) arguments is well established in the nuclear industry. A 'detectable leakage'rnLbB procedure, similar to that of NUREG 1061, is commonly used. Such a procedure is included in the UK R6 defectrnassessment procedures and involves achieving an adequate margin between the evaluated critical crack length and therndetectable leakage crack length. However, experience in applying LbB methods with the effects of creep included in thernanalysis is still limited. This paper contains results of calculations aimed at assessing how these influences impact upon thernsafety margins achieved in a low temperature application.rnIt has been demonstrated that the limiting crack length reduces with creep time. This has a detrimental effect whenrnproducing a high temperature LbB case. It has also been shown that the length of crack required for a detectable leakagernreduces with creep time, the effect being most noticeable for long creep times. This has a beneficial effect when producing arnhigh temperature LbB case.
机译:在核工业中,使用“先漏后漏”(LbB)的论点已经很成熟。通常使用类似于NUREG 1061的“可检测泄漏” rnLbB程序。这种程序包括在UK R6缺陷评估程序中,并且涉及在评估的临界裂纹长度和可检测的泄漏裂纹长度之间获得足够的余量。但是,在分析中包含蠕变效应而应用LbB方法的经验仍然有限。本文包含计算结果,旨在评估这些影响如何影响低温应用中获得的安全裕度。已证明极限裂纹长度随蠕变时间而减小。当产生高温LbB盒时,这具有有害作用。还显示出,可检测到的泄漏所需的裂纹长度随蠕变时间而减少,对于长蠕变时间而言,这种影响最为明显。这在生产耐高温LbB外壳时具有有益的作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号