【24h】

Widening of the A12 Motorway and the Pont du Diable Overpass

机译:A12高速公路和杜邦杜比桥立交桥的拓宽

获取原文
获取原文并翻译 | 示例

摘要

This project is a remarquable example of the construction requirements which are specified in urban areas where both railway and motorway traffic cannot be disturbed anytime. In fact the development of the Paris suburb and the daily traffic of commuting people are increasing. The A12 motorway was 2 x 2 lanes. A widening to 2 x 4 lanes was needed. The railway overpass at Bois d'Arcy carries two tracks running from Paris to Normandie. The goal was to carry out the works while keeping running the traffic on the motorway constantly. Only once the railway traffic could be stopped - six hours - at night. Heavy penalties should be applied if these requirements were not met.
机译:该项目是建筑要求的一个很好的例子,在任何时候都不能干扰铁路和高速公路交通的城市地区,这些要求是明确的。实际上,巴黎郊区的发展和通勤人员的日常交通正在增加。 A12高速公路为2 x 2车道。需要将通道扩大到2 x 4。 Bois d'Arcy的铁路立交桥有两条轨道,从巴黎延伸到诺曼底。目标是在保持高速公路交通持续运行的同时进行工程。晚上只有一次铁路交通可以停下来-六个小时。如果不满足这些要求,则应施加重罚。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号