首页> 外文会议>14th International Conference on Nuclear Engineering 2006(ICONE14) vol.1 >Application of Standard Maintenance Windows in PHWR Outage
【24h】

Application of Standard Maintenance Windows in PHWR Outage

机译:标准维护窗口在PHWR中断中的应用

获取原文
获取原文并翻译 | 示例

摘要

The concept of Standard Maintenance Windows has been widely used in the planned outage of light water reactor in the world. However, due to the specific feature of Pressurized Heavy Water Reactor (PHWR), it has not come to a consensus for the PHWR owners to adopt Standard Maintenance Windows for planned outage aiming at the optimization of outage duration. Third Qinshan Nuclear Power Company (TQNPC), with their experience gained in the previous outages and with reference to other PHWR power plants, has identified a set of Standard Maintenance Windows for planned outage. It can be applied to similar PHWR plants and with a few windows that are specific to Qinshan Phase III NPP. The use of these Standard Maintenance Windows in planned outage has been proved to be effective in control shutdown nuclear safety, minimize the unavailability of safety system, improve the efficient utilization of outage duration, and improved the flexibility of outage schedule in the case of emergency issue, which forced the revision of outage schedule. It has also formed a solid foundation for benchmarking. The identification of Standard Maintenance Windows and its application will be discussed with relevant cases for the common improvement of outage duration.
机译:标准维护窗口的概念已在世界范围内计划中的轻水反应堆停运中广泛使用。但是,由于加压重水堆(PHWR)的特殊功能,对于PHWR所有者采用计划维护的标准维护时段以优化中断持续时间尚未达成共识。秦山第三核电公司(TQNPC)在先前的停电事故中积累了经验,并参考了其他PHWR电厂,确定了一套计划停电的标准维护时段。它可以应用于类似的PHWR工厂,并带有一些专门针对秦山三期核电厂的窗口。实践证明,在计划内停运中使用这些“标准维护”窗口可有效控制停机核安全,最大程度地减少安全系统的不可用性,提高停电持续时间的有效利用,并在紧急情况下提高停电计划的灵活性,这迫使修改停机计划。它也为基准测试奠定了坚实的基础。将针对相关案例讨论标准维护窗口的标识及其应用,以期共同改善中断时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号