SYSTEMATIC APPROACH TO AGING LNG TERMINALS

机译:LNG终端老化的系统方法

获取原文
获取原文并翻译 | 示例

摘要

The LNG receiving terminals of Osaka Gas Co., Ltd. have been in operation for more than 30 years, and problems such as corrosion are being found in some places. To confirm the reliability of these LNG terminals and facilities, we have been conducting cross-sectional equipment inspections and studies aimed at determining effective and efficient countermeasures, since 1997.rnThis report introduces a summary of these activities, focusing on examination procedures.First we determined the possible deterioration modes for various types of equipment, based on the particular characteristics of the different parts of that equipment. We then compared the results with the items on the maintenance checklists to confirm which deterioration modes should be given management priority. Next we conducted comprehensive inspections for each deterioration mode, placing priority on facilities related to flammable fluids, and determined maintenance management methods based on the confirmed current condition of the respective facilities. Finally, the former maintenance manuals were revised, and these results were reflected in our maintenance operations.rnWe will introduce the following three specific examples of case studies that werernperformed.rn1. Ordinary-temperature piping rnMaintenance management standards and protective measures implemented.rn2. Urethane blocks to support cryogenic piping rnActual sampling inspections and replacement criteria.rn3. Concrete structuresrn Maintenance management standards and life cycle costing (LCC) evaluations for future repairs.
机译:大阪煤气有限公司的LNG接收站已经运行了30多年,在某些地方还发现了腐蚀等问题。为了确认这些LNG接收站和设施的可靠性,自1997年以来,我们一直在进行横断面设备检查和研究,旨在确定有效而有效的对策.rn本报告对这些活动进行了总结,重点是检查程序。基于设备不同部分的特定特性,各种设备可能出现的劣化模式。然后,我们将结果与维护清单上的项目进行比较,以确认应将哪些劣化模式给予管理优先级。接下来,我们对每种劣化模式进行了全面检查,将与易燃液体相关的设施放在优先位置,并根据确认的各个设施的当前状况确定维护管理方法。最后,对以前的维护手册进行了修订,并将这些结果反映在我们的维护操作中。rn我们将介绍以下三个进行过案例研究的特定示例。普通温度管道rn实施维护管理标准和保护措施rn2。支撑低温管道的聚氨酯块rn实际采样检查和更换标准rn3。混凝土结构–维修管理标准和生命周期成本(LCC)评估,以备将来维修之用。

著录项

  • 来源
  • 会议地点 Doha(QA);Doha(QA);Doha(QA);Doha(QA)
  • 作者单位

    Engineering Department Production Department Osaka Gas Co., Ltd. 4-1-2 Hiranomachi Chuo-ku Osaka, 541-0046, JAPAN http://www.osakagas.co.jp;

    Engineering Department Production Department Osaka Gas Co., Ltd. 4-1-2 Hiranomachi Chuo-ku Osaka, 541-0046, JAPAN http://www.osakagas.co.jp;

    Engineering Department Production Department Osaka Gas Co., Ltd. 4-1-2 Hiranomachi Chuo-ku Osaka, 541-0046, JAPAN http://www.osakagas.co.jp;

    Engineering Department Production Department Osaka Gas Co., Ltd. 4-1-2 Hiranomachi Chuo-ku Osaka, 541-0046, JAPAN http://www.osakagas.co.jp;

    Engineering Department Production Department Osaka Gas Co., Ltd. 4-1-2 Hiranomachi Chuo-ku Osaka, 541-0046, JAPAN http://www.osakagas.co.jp;

    Engineering Department Production Department Osaka Gas Co., Ltd. 4-1-2 Hiranomachi Chuo-ku Osak;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TE626.7;
  • 关键词

  • 入库时间 2022-08-26 13:57:34

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号